User Tools

Site Tools


timelines:eyes_turned_skyward_key_dates

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

timelines:eyes_turned_skyward_key_dates [2015/10/14 07:02] – [2004] nixonsheadtimelines:eyes_turned_skyward_key_dates [2019/03/29 15:13] (current) – external edit 127.0.0.1
Line 991: Line 991:
  
 **March 2009:** President Woods directs Administrator Banks to conduct a broad-scope review of NASA’s capabilities and direction, and provide recommendations for a plan for the future. **March 2009:** President Woods directs Administrator Banks to conduct a broad-scope review of NASA’s capabilities and direction, and provide recommendations for a plan for the future.
 +
 +**March 2009:** The Venus Atmospheric System Explorer, or VASE, mission, is selected as a Pioneer mission.
  
 **Summer 2009:** TransOrbital Services is declared open for business. **Summer 2009:** TransOrbital Services is declared open for business.
Line 998: Line 1000:
 **Late 2009:** The Banks Report proposes development of Saturn-II, with a VTVL reusable 1st stage. **Late 2009:** The Banks Report proposes development of Saturn-II, with a VTVL reusable 1st stage.
  
-**??? 2009:** The Venus Atmospheric System Explorer, or VASE, mission, is selected as Pioneer mission. +**October 2009:** Launch of the Mars Polar Lander by Star Launch Thunderbolt with a solid third stage.
 ====2010==== ====2010====
  
timelines/eyes_turned_skyward_key_dates.txt · Last modified: 2019/03/29 15:13 by 127.0.0.1

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki