Line 889: Line 889:
  
 **?? 2004:**  The projected launch date for Luna-Glob slips from 2006 to 2008. An alternative rover mission is proposed, Luna 25/Lunokhod 3.  This proposal is initially rejected.  **?? 2004:**  The projected launch date for Luna-Glob slips from 2006 to 2008. An alternative rover mission is proposed, Luna 25/Lunokhod 3.  This proposal is initially rejected. 
 +
 +**?? 2004:**  Launch of the second High-Energy Event Explorer satellite (HEEE-2).
  
 **March 2004:** Japan launches Planet-C to Venus on the 3rd mission of the Mu-5 rocket.  The probe is re-named Akatsuki, or “Dawn”.  On arrival at Venus, the probe suffers an electrical problem that limits its communications capability. **March 2004:** Japan launches Planet-C to Venus on the 3rd mission of the Mu-5 rocket.  The probe is re-named Akatsuki, or “Dawn”.  On arrival at Venus, the probe suffers an electrical problem that limits its communications capability.
Line 989: Line 991:
  
 **March 2009:** President Woods directs Administrator Banks to conduct a broad-scope review of NASA’s capabilities and direction, and provide recommendations for a plan for the future. **March 2009:** President Woods directs Administrator Banks to conduct a broad-scope review of NASA’s capabilities and direction, and provide recommendations for a plan for the future.
 +
 +**March 2009:** The Venus Atmospheric System Explorer, or VASE, mission, is selected as a Pioneer mission.
  
 **Summer 2009:** TransOrbital Services is declared open for business. **Summer 2009:** TransOrbital Services is declared open for business.
Line 996: Line 1000:
 **Late 2009:** The Banks Report proposes development of Saturn-II, with a VTVL reusable 1st stage. **Late 2009:** The Banks Report proposes development of Saturn-II, with a VTVL reusable 1st stage.
  
-**??? 2009:** The Venus Atmospheric System Explorer, or VASE, mission, is selected as Pioneer mission. +**October 2009:** Launch of the Mars Polar Lander by Star Launch Thunderbolt with a solid third stage.
 ====2010==== ====2010====
  