User Tools

Site Tools


offtopic:aeromaxx

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
offtopic:aeromaxx [2009/08/17 19:52] – created AeroMaxxofftopic:aeromaxx [2019/03/29 15:13] (current) – external edit 127.0.0.1
Line 4: Line 4:
  
 His most recent project has been collaborating with FDW in making a U.S. mass transit timeline series, an idea originally conceived by FDW titled "For Want of a Voice" The series currently has two active timelines in the works: His most recent project has been collaborating with FDW in making a U.S. mass transit timeline series, an idea originally conceived by FDW titled "For Want of a Voice" The series currently has two active timelines in the works:
 +
 - BARTwank, //FDW//: an alternate Bay Area Rapid Transit system for the San Francisco Bay Area in California, with the elements of both a regional commuter rail network & a subway-style system similar to New York City's famed subway.  The timeline starts in 1967 with the opening of the MacArthur-Fremont line, and continues to the present day. - BARTwank, //FDW//: an alternate Bay Area Rapid Transit system for the San Francisco Bay Area in California, with the elements of both a regional commuter rail network & a subway-style system similar to New York City's famed subway.  The timeline starts in 1967 with the opening of the MacArthur-Fremont line, and continues to the present day.
 +
 - The Road Not Taken, //AeroMaxx//: focuses on the city of Denver, Colorado, and its endeavor to construct a world-class metro system in a city only a fraction the size of metropolises like Chicago, Los Angeles, New York, the SF Bay Area.  The timeline starts with the opening of the first phase in 1986, and continues onward through the 21st Century. - The Road Not Taken, //AeroMaxx//: focuses on the city of Denver, Colorado, and its endeavor to construct a world-class metro system in a city only a fraction the size of metropolises like Chicago, Los Angeles, New York, the SF Bay Area.  The timeline starts with the opening of the first phase in 1986, and continues onward through the 21st Century.
  
offtopic/aeromaxx.txt · Last modified: 2019/03/29 15:13 by 127.0.0.1

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki