You are using an out of date browser. It may not display this or other websites correctly. You should upgrade or use an alternative browser.
alternatehistory.com
I've decided to take my posts from the 1930s RN Sanity Options Thread because I think it has grown sufficiently to justify a thread of its own and because the comments on that thred and other discussions were breaking it up.
Version 1.0 Completed at Friday 24th March 2017
Part 03 - Plans and Reality - The 1919 Plan
Part 04 - Plans and Reality - The 1924 Plan
Part 05 - Plans and Reality - Admiralty Plans in 1929 Before the First London Naval Conference
Part 06 - Plans and Reality - The Situation in 1934
Part 07 - Plans and Reality - The "One Power" Naval Standard 1934-35
Part 08 - Plans and Reality - The "Two Power" Naval Standard 1935-36
Part 09 - The Situation at 3rd September 1939 IOTL
Part 10 - Armament and the Naval Armaments Industry
Part 11 - Submarines
Part 12 - Aircraft Carriers
Part 13 - Battleships
Part 14 - Cruisers
Part 15 - Destroyers
Part 16 - Minor War Vessels
Part 21 - The Situation on 3rd September 1939 ITTL
The above are now complete or as complete as they ever will be.
Version 1.1 Completed at Friday 24th March 2017
Part 19 - Summary of Building Programmes IOTL and ITTL
Version 1.2 Completed at Monday 27th March 2017
Part 16 - Minor War Vessels - Amended
Part 17 - Coastal Warfare Vessels - Complete
Part 18 - Amphibious Warfare Vessels and Auxiliaries - The following sub-sections are now complete:
Royal Navy Manned Depot Ships and Auxiliaries
The Royal Fleet Auxiliary in 1939 from Jane's Fighting Ships 1939
Tanker Construction IOTL
Tanker Construction ITTL
Part 19 - Summary of Building Programmes IOTL and ITTL
This has been amended by adding the estimated cost of the extra warships. That was planned to be in Part Twenty, but I decided that it fitted better here.
Part 21 - The Situation on 3rd September 1939 ITTL - Amended