I've decided to take my posts from the 1930s RN Sanity Options Thread because I think it has grown sufficiently to justify a thread of its own and because the comments on that thred and other discussions were breaking it up.

Version 1.0 Completed at Friday 24th March 2017
Part 03 - Plans and Reality - The 1919 Plan
Part 04 - Plans and Reality - The 1924 Plan
Part 05 - Plans and Reality - Admiralty Plans in 1929 Before the First London Naval Conference
Part 06 - Plans and Reality - The Situation in 1934
Part 07 - Plans and Reality - The "One Power" Naval Standard 1934-35
Part 08 - Plans and Reality - The "Two Power" Naval Standard 1935-36
Part 09 - The Situation at 3rd September 1939 IOTL
Part 10 - Armament and the Naval Armaments Industry
Part 11 - Submarines
Part 12 - Aircraft Carriers
Part 13 - Battleships
Part 14 - Cruisers
Part 15 - Destroyers
Part 16 - Minor War Vessels

Part 21 - The Situation on 3rd September 1939 ITTL

The above are now complete or as complete as they ever will be.
Version 1.1 Completed at Friday 24th March 2017
Part 19 - Summary of Building Programmes IOTL and ITTL​

Version 1.2 Completed at Monday 27th March 2017
Part 16 - Minor War Vessels - Amended
Part 17 - Coastal Warfare Vessels - Complete
Part 18 - Amphibious Warfare Vessels and Auxiliaries - The following sub-sections are now complete:
  • Royal Navy Manned Depot Ships and Auxiliaries
  • The Royal Fleet Auxiliary in 1939 from Jane's Fighting Ships 1939
  • Tanker Construction IOTL
  • Tanker Construction ITTL
Part 19 - Summary of Building Programmes IOTL and ITTL
This has been amended by adding the estimated cost of the extra warships. That was planned to be in Part Twenty, but I decided that it fitted better here.​